<?xml version="1.0" encoding="UTF-8"?>
<urlset xmlns="http://www.sitemaps.org/schemas/sitemap/0.9"
        xmlns:image="http://www.google.com/schemas/sitemap-image/1.1">
  <url>
    <loc>https://novostroyllc.org/</loc>
    <changefreq>monthly</changefreq>
    <priority>1.0</priority>
  </url>
  <url>
    <loc>https://novostroyllc.org/projects.html</loc>
    <changefreq>weekly</changefreq>
    <priority>0.9</priority>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-before-1.jpg</image:loc>
      <image:title>Gap under home foundation footing where soil eroded away, exposing the concrete footing at the gable end</image:title>
      <image:caption>Foundation footing exposed where eroded soil left a gap at the gable end.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-before-2.jpg</image:loc>
      <image:title>Cracked mortar joint along the brick foundation caused by soil settlement</image:title>
      <image:caption>Mortar joint cracking along the foundation line from the settlement.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-result-2.jpg</image:loc>
      <image:title>Downspout drain extension pipe pulled from the ground, packed solid with dirt and roots</image:title>
      <image:caption>The old drain extension, packed solid with dirt and roots — no water was getting away from the foundation.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-result-3.jpg</image:loc>
      <image:title>New drain line installed along the foundation next to the gas meter, bed finished with fresh mulch</image:title>
      <image:caption>New drain line installed the full run, foundation crack sealed, bed finished with fresh mulch.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-after-1.jpg</image:loc>
      <image:title>Repaired foundation area backfilled with sand after concrete support and waterproof membrane were installed</image:title>
      <image:caption>Support poured, waterproofed, and backfilled with sand.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-after-2.jpg</image:loc>
      <image:title>Finished foundation repair along the brick wall near the gas meter, backfilled and leveled</image:title>
      <image:caption>Finished repair along the foundation near the gas meter, backfilled and leveled.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project01-foundation-result-1.jpg</image:loc>
      <image:title>Finished mulch bed and stone edging along the front porch after the job</image:title>
      <image:caption>Beds and stone edging reset out front once the work was finished.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project02-shower-before-1.jpg</image:loc>
      <image:title>Demolished shower floor section down to subfloor and wall insulation, exposing the uneven concrete substrate causing standing water</image:title>
      <image:caption>Tile and substrate removed down to the framing to fix the slope at the source, not just skim over it.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project02-shower-waterproofing-1.jpg</image:loc>
      <image:title>Shower pan after fresh concrete pour with proper slope to the drain, coated in two-level waterproofing membrane</image:title>
      <image:caption>Shower pan after fresh concrete pour with proper slope to the drain, coated in two-level waterproofing membrane</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project02-shower-waterproofing-2.jpg</image:loc>
      <image:title>Full waterproofed shower pan and bench seat before new tile installation</image:title>
      <image:caption>Full waterproofed shower pan and bench seat before new tile installation</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project02-shower-after-1.jpg</image:loc>
      <image:title>Finished shower floor with new mosaic tile and matching tiled bench seat, water now draining properly</image:title>
      <image:caption>New tile set over the releveled, waterproofed pan — water now drains properly.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project03-sink-drain-repair-1.jpg</image:loc>
      <image:title>Repairing an incorrectly connected kitchen sink drain leaking under the cabinet</image:title>
      <image:caption>Tracing the leak back to a bad drain connection under the sink and fixing it on the spot.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project04-towel-holder-before-1.jpg</image:loc>
      <image:title>Bare tile spot where a ceramic towel bar holder had come loose and fallen off</image:title>
      <image:caption>Bare tile where the ceramic towel holder had come loose and fallen off.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project04-towel-holder-piece-1.jpg</image:loc>
      <image:title>Old adhesive being cleaned off the back of the ceramic towel holder before re-mounting</image:title>
      <image:caption>Old adhesive cleaned off the piece before re-mounting it with epoxy.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project05-mirror-install-1.jpg</image:loc>
      <image:title>Applying mirror-safe adhesive to the wall above a bathroom vanity before mounting a frameless mirror</image:title>
      <image:caption>Mirror-rated adhesive applied to a cleaned, degreased wall — standard construction adhesive would stain the mirror backing.</image:caption>
    </image:image>
    <image:image>
      <image:loc>https://novostroyllc.org/images/project05-mirror-install-2.jpg</image:loc>
      <image:title>Frameless bathroom mirror mounted above the vanity, taped in place while the adhesive cures</image:title>
      <image:caption>Mirror set and taped in place under the new vanity light while the adhesive cures.</image:caption>
    </image:image>
  </url>
  <url>
    <loc>https://novostroyllc.org/privacy-policy.html</loc>
    <changefreq>yearly</changefreq>
    <priority>0.2</priority>
  </url>
</urlset>
